TSX-V: MMV
February 19 drilling update
Detail of arsenopyrite mineralization in ST19-11 from 374m - 383m interval
Detail of quartz flooded Rochford Iron Formation with pyrrhotite-hydrothermal chlorite in ST19-11 at 452m
Quartz vein with hydrothermal chlorite, pyrrhotite, and arsenopyrite in ST19-11B at 553m
374 m to 383 m: A sheared, brecciated grey quartz-flooded alteration zone (60 per cent vein material/40 per cent altered phyllite) was intersected. The zone contains medium-grained to coarse arsenopyrite throughout. Locally, arsenopyrite is semi-massive to massive (greater than 50 per cent) but comprises 3 per cent to 7 per cent overall through the interval. Subordinate pyrrhotite ranges from 1 per cent to 3 per cent
374 m to 383 m: A sheared, brecciated grey quartz-flooded alteration zone (60 per cent vein material/40 per cent altered phyllite) was intersected. The zone contains medium-grained to coarse arsenopyrite throughout
2019 Drilling Plan Map, Standby Mine Area
2019 3d view of current drilling at Standby Mine
© 2020 Mineral Mountain Resources Ltd.
All rights reserved.